News Archive

News Image

Small Boat Launch Closed for Biannual Repair and Winter Storm Preparation

November 14, 2017 

The small boat launch will be closed for its biannual repairs and winter storm preparation. For an alternative boat launch, go to the Marina Office located at 181 North Harbor Drive. It is located on the International Boardwalk south of the R10 social house.


Pier Inspection Report Available

July 26, 2017 

The Public Works Department is responsible for maintenance of many of the harbor facilities, including the piers. An inspection of the pier structures, both above and under the water line, was commissioned by the City Council in September 2016. The inspection report produced from the effort is available here.

filetype
7/26/2017 1:03:04 PM (size:12.09 MB)

SEASIDE LAGOON NEW DISCHARGE PERMIT & TSO HEARING JUNE 1, 2017

May 3, 2017 

Operation of the Seaside Lagoon is regulated by Waste Discharge Requirements specified in a NPDES Permit that is enforced by the Los Angeles Regional Water Quality Control Board. The existing Permit, issued in 2010, was scheduled to expire in 2015 but has remained in effect pending the Regional Board’s issuance of a new Permit. A Tentative Order and Time Schedule Order will be considered by the Regional Board on June 1, 2017.

Read More »

Beryl Street Improvement Project

July 16, 2016 
As part of the Beryl Street Improvement Project, the City of Redondo Beach and Torrance will conduct a full closure of Beryl Street between Flagler Lane and 190th St from June 27th to August 31st. Because of the impact that a full closure will have on Beryl Street, the City of Redondo Beach and Torrance strongly urge motorists to plan for alternate routes.

Click here for a detour map (JPG).
Read More »

News Image

Beryl Street and Flagler Closure

July 13, 2016 
In continuing the Beryl Street Improvement Project and in addition to the full closure currently ongoing on Beryl Street, the City of Redondo Beach and Torrance will conduct a full closure at the intersection of Beryl Street and Flagler Lane from July 13th to July 15th. Because of the impact that a full closure will have at the intersection, the City of Redondo Beach and Torrance strongly urge motorists to plan for alternate routes.

Click here for detour map.



Redondo Beach City Departments Reorganized

March 18, 2013 
On December 28, 2012 the City of Redondo Beach reorganized three departments - Public Works, Planning, and Engineering & Building Services.
View PDF

Stakeholder Meeting : Street and Landscape Improvements North Harbor Drive and Herondo Street

January 23, 2013 
On January 30, 2013, between 6:00 p.m. and 7:30 p.m., the City of Redondo Beach will hold a second Stakeholder Meeting at the Redondo Beach Main Library, 415 Diamond Street, Redondo Beach. The purpose of the meeting is to discuss project concepts developed following the first stakeholder meeting held on December 19, 2012. The project concepts will include street and landscape improvements along North Harbor Drive and Herondo Street.
View PDF Read More »

Redondo Beach - Beach Renourishment Project

August 9, 2012 

For the week of 10/8/2012

The replenishment operation made up some time and the onshore replenishment is complete. The barge (Paul Lee) has left Redondo Beach and the contractor will be moving equipment off of the beach today and tomorrow. Per last week’s meeting, the project is expected to be completed on October 15 and completely demobilized on October 22.

Summary
As part of U.S. Army Corps of Engineer's Marina Del Rey Maintenance Dredging Project, the beach area between the Topaz and Ruby street intersections will be nourished with 75,000 cubic yards of clean sand. An additional 85,000 cubic yards of clean sand from Marina Del Rey's north entrance will also be deposited in an offshore storage site (approximately 500 yards offshore/southwest of the Topaz Street lifeguard tower) for future renourishing efforts.

The nourishment operation will include the pumping of clean sand from a barge stationed in the ocean waters through a pipe to the beach. A spreader (i.e., bull-dozer) will distribute the pumped sand along the beach within the project limits. The nourishment will occur continuously in a 24 hour period for approximately 45 days.
Read More »


News Image

New Harbor Patrol / Fire Station 3 Construction

August 3, 2011 
On August 17th, the installation of the structural support beams for the City's new Harbor Patrol/Fire Station 3 facility have been completed. We would like to thank the residents and the boating community for their patience and understanding during this challenging phase of the construction and we do not anticipate any further need for this type of activity. We will continue to post updates on the City's Web Page as the construction continues. Should you have questions, you may contact the Redondo Beach Harbor Department at 310-318-0631.
Read More »





Archives...
Top