Waterfront Project

Waterfront Final Environmental Impact Report (FEIR)
Volume 1 of 2

FEIR Coversheet

Table of Contents

FEIR Chapter 1 Introduction

FEIR Chapter 2 Response to Comments

Response to Comments Index
Response to Comments pages 1-500
Response to Comments pages 501-750
Response to Comments pages 751-1170


FEIR Chapter 3 Modifications to Draft EIR

Chapter 3 Modifications to DEIR

Volume 2 of 2 - Agency Letters and Public Comments

Volume 2 Coversheet

Volume 2 Table of Contents

Response to Comments Index

State Bracketed Letters
Regional Bracketed Letters
Local Bracketed Letters
PC001-PC050
PC051-PC100
PC101-PC150
PC151-PC200
PC201-PC250
PC251-PC300
PC301-PC350
PC351-PC400
PC401-PC450
PC451-PC500
PC501-PC561


Draft Environmental Impact Report

Draft Environmental Impact Report Executive Summary (PDF) (16.1 MB)

Chapter 1 Introduction (840 KB)

Chapter 2 Project Description (150 MB)

Chapter 3 Environmental Analysis
3.0 Introduction (34 KB)
3.1 Aesthetics and Visual Resources (51.5 MB)
3.2 Air Quality (692 KB)
3.3 Biological Resources (822 KB)
3.4 Cultural Resources (2.4 MB)
3.5 Geology and Soils (1.4 MB)
3.6 Greenhouse Gas Emissions (96 KB)
3.7 Hazards and Hazardous Materials (663 KB)
3.8 Hydrology and Water Quality (3.7 MB)
3.9 Land Use and Planning (2.6 MB)
3.10 Noise (1.1 MB)
3.11 Public Services (831 KB)
3.12 Recreation (68 MB)
3.13 Traffic and Transportation (211 MB)
3.14 Utilities (17 MB)

Chapter 4 Analysis of Alternatives (8.8 MB)

Chapter 5 Other CEQA Considerations (106 KB)

Chapter 6 References (91 KB)

Chapter 7 List of Preparers (10 KB)

Chapter 8 Acronyms and Abbreviations (72 KB)

Draft Environmental Impact Report Appendices in PDF format

Appendix A: Notice of Preparation/Initial Study/CEQA Scoping Summary Report (35 MB)
Appendix B: NEST Square Footages of Existing Buildings (2.7 MB)
Appendix C1 - 8: Air Quality Modeling Assumption, Calculations, and Output Files (3.3 MB)
Appendix D1: Biological Resources Assessment (4.2 MB)
Appendix D2: California Natural Diversity Database (CNDDB) Search Results (386 KB)
Appendix D3: National Marine Fisheries Service’s (NMFS’) Guidelines for Overwater Structures (737 KB)
Appendix E1: Archaeological Investigation (752 KB)
Appendix E2: Historic Resources Evaluation Report (7 MB)
Appendix E3: Paleontological Resources Assessment (924 KB)
Appendix F: Preliminary Geotechnical Engineering Report (22 MB)
Appendix G1 - 5: GHG Modeling Assumption, Calculations, and Output Files (900 KB)
Appendix H: Phase I Environmental Assessment (53.4 MB)
Appendix I1: Summary of Hydrology Design Intent (2.6 MB)
Appendix I2: Water Circulation and Water Quality Impacts Memorandum (5.8 MB)
Appendix I3: Sea Level Rise and Wave Uprush Assessment (592 KB)
Appendix J: Noise Calculation Worksheets (237 KB)
Appendix K: Coastal Access Program (13.9 MB)
Appendix L1: Transportation Impact Study (13.9 MB)
Appendix L2: King Harbor Small Craft Traffic Assessment (708 KB)
Appendix M1: Water Supply Assessment (367 KB)
Appendix M2: Will Serve Letters (593 KB)
Appendix N: Alternatives Air Quality and GHG Worksheets (1 MB)
Appendix O: Market Study of the Proposed Waterfront Revitalization Project (1.1 MB)

Public Workshop PowerPoint Presentation

Top