Low Graphics Version
 
Tuesday, May 13, 2008
HomeHomePage City Offices Recreation & Community Services Facilities Seaside Lagoon >Rehabilitate Email this Page
 Print friendly format

Facility Planning Option 3

Facility Planning Option 3 in PDF (printable)

Option # 3 – Construct a new Harbor area Special Events Venue, Modest Recreational Water Park with Traditional Swimming Pool, and Boat Ramp

Under this option a 6,000 square foot recreation pool with a single waterslide, zero-depth entry, and wet play elements, and a 6 lane x 25 yard traditional swimming pool would be constructed in the facility (see attachment C.)  The facility would also include a bathhouse, a food concession building, storage space for pool equipment and chemicals, a covered raised stage, approximately 40,000 square feet of special events area, landscaping, fencing and site lighting. 

The preliminary capital cost estimate for the Special Events Venue and Water Park is $9.4 million dollars.  The site plan also includes a 150 space on-grade parking lot that is estimated to cost $300,000.  Additionally the site plan includes a two-lane boat launch ramp with 28 trailer parking spaces at a capital cost that is TBD.  The annual operating expenditure estimate for this option is $1,100,000 and the revenue estimate is $900,000.  The early projection for ongoing Harbor Tidelands Fund subsidy with this option is $200,000 per year.

Pros:

  • Installation of some contemporary water play elements
  • Year round water activity, particularly through use of the traditional swimming pool
  • A parking lot controlled by the City would create new revenue
  • No NPDES permit requirements
  • Installation of a Harbor area boat ramp

Cons:

  • Only mild reduction in need for Harbor Tidelands Fund subsidy, largely due to the minimal operating cost recovery of traditional swimming pool features
  • Somewhat limited special event space
  • Loss of the casual/comfortable feel of the existing Seaside Lagoon facility

Option 1  ---  Option 2  ---  Option 3  ---  Option 4  ---  Option 5   --- Conceptual Options

Questionnaire  (Please fill out and Return)

(flyer) Meeting Dates - Times - Locations

Sign up for our E-Zine Notifications emails on up coming meetings and progress reports

 

 

Privacy Policy

Take our web site survey

Top 
Copyright © 2001-2008, City of Redondo Beach

Powered by Civica Software