Facility Planning Option 3
Facility Planning Option 3 in PDF
(printable)
Option # 3 – Construct a new
Harbor area Special Events Venue, Modest Recreational Water Park with
Traditional Swimming Pool, and Boat Ramp

Under this option
a 6,000 square foot recreation pool with a
single waterslide, zero-depth entry, and wet play elements, and a 6 lane x 25
yard traditional swimming pool would be constructed in the facility (see
attachment C.) The
facility would also include a bathhouse, a food concession building, storage
space for pool equipment and chemicals, a covered raised stage, approximately
40,000 square feet of special events area, landscaping, fencing and site
lighting.
The preliminary capital cost
estimate for the Special Events Venue and Water Park is $9.4
million dollars. The site plan also includes a 150 space on-grade parking lot
that is estimated to cost $300,000. Additionally the site plan includes a
two-lane boat launch ramp with 28 trailer parking spaces at a capital cost that
is TBD. The annual operating expenditure estimate for this option is
$1,100,000 and the revenue estimate is $900,000. The early projection for
ongoing Harbor Tidelands Fund subsidy with this option is $200,000 per year.
Pros:
-
Installation of some
contemporary water play elements
-
Year round water activity,
particularly through use of the traditional swimming pool
-
A parking lot controlled by
the City would create new revenue
-
No NPDES permit
requirements
-
Installation of a Harbor
area boat ramp
Cons:
-
Only mild reduction in need
for Harbor Tidelands Fund subsidy, largely due to the minimal operating cost
recovery of traditional swimming pool features
-
Somewhat limited special
event space
-
Loss of the
casual/comfortable feel of the existing Seaside Lagoon facility
Option 1
--- Option 2
--- Option 3 ---
Option 4 --- Option 5
---
Conceptual Options
Questionnaire (Please fill out and Return)
(flyer) Meeting Dates - Times - Locations
Sign
up for our E-Zine Notifications emails on up coming meetings and progress
reports
|