Facility Planning Option 2

Option # 2 – Rehabilitate the Lagoon’s Structures and Modernize the Current Water Feature

Under this option staff would completely rehabilitate the facility’s buildings and structures, install a non-permeable shell for the water feature, and add water circulation and filtration equipment (see attachment B.)  The preliminary capital cost estimate for this option is $4.5 million dollars.  The annual operating expenditure estimate is $625,000 and the revenue estimate is $400,000.  The early projection for ongoing Harbor Tidelands Fund subsidy with this option is $225,000 per year.

Pros:

  • Continues the Lagoon’s traditional water feature and special events activities on a long term basis
  • Eliminates need for an NPDES permit

Cons:

  • Perpetuates the need for Tidelands Fund subsidy at roughly the current level
  • No installation of contemporary water play elements
  • No year round water activity
  • Precludes the installation of a Harbor area boat ramp

Option 1  ---  Option 2  ---  Option 3  ---  Option 4  ---  Option 5   --- Conceptual Options

Questionnaire  (Please fill out and Return)

(flyer) Meeting Dates - Times - Locations

Sign up for our E-Zine Notifications emails on up coming meetings and progress reports

 

Privacy Policy

Take our web site survey

Top 
Copyright © 2001-2008, City of Redondo Beach

Powered by Civica Software